Define the operating period
Set the mission, roster, decision points, and reporting rhythm.
Get the practical plan for standing up a small operations center, connecting field teams, and moving useful reports when normal communications become unreliable.
Enter your email. The download appears on this page as soon as the form is submitted.
Operational emails only. Unsubscribe whenever you want. We do not sell your information.
The roadmap takes you from a field observation to a verified TOC picture, an assigned action, and a scheduled follow-up.
Set the mission, roster, decision points, and reporting rhythm.
Cover operations, communications, logging, mapping, and tasks.
Use independent paths with clear triggers for changing over.
Move WHO, WHERE, WHAT, WHEN, IMPACT, and NEED clearly.
Receive, verify, display, assign, and follow up.
Disable the primary path and prove the handoff still works.
No vague preparedness slogans. You get worksheets, a reporting template, the first-24-hours sequence, and a drill you can run with the equipment you already own.

The product is the logical next step only when you want the field information and TOC picture available offline, organized, and repeatable.
Build the roster, communications plan, map, reports, tasks, weather picture, logs, and operational workspace on your own Windows system.
Put field packets, offline communications references, maps, mesh tools, and XTOC-connected workflows on phones, tablets, and desktops.
Download the plan. Fill in the worksheet. Put a 30-minute drill on the calendar. Then fix the first handoff that breaks.
Use communications and monitoring tools lawfully. Software supports operator decisions; it does not replace training, judgment, verification, or appropriate procedures.
Save it locally, fill in the PACE worksheet, and schedule the 30-minute drill.
FOLLOW MKME ON GOOGLE
Add MKME STORE as a preferred source for our latest guides, field tutorials, and product updates.